How vNode delivered secure OPC UA interoperability between Advantech SCADA and ABB Historian at DEWA’s Jebel Ali Power Station by resolving critical NodeID namespace incompatibilities, while keeping all turbines fully operational.
DEWA required historian logging for its GT4 and GT5 turbines. However, the Advantech OPC UA server exposed numeric NodeIDs, which ABB Historian cannot interpret, as it only supports string-based NodeIDs.
There was no native translation layer available and turbine operations could not be interrupted.
Key pain bullets:
Real-time optimization reduced drilling times and improved decision-making processes.
The project development time was significantly reduced, accelerating time-to-market.
The solution was successfully replicated across various projects, establishing a strong framework for future scalability.
Precise and dynamic pressure management led to improved safety and operational stability.
Continuous technical support from vNode ensured the system’s reliability and adaptability.
“Not only did vNode solve our customer’s outdated hardware problem, but it also provided us with a scalable and easy-to deploy solution. Vester Business’ technical support was key to the success of the project.”
With over 23 years of experience in industrial automation, HEXA Ingenieros specializes in advanced solutions for process control and monitoring. They provide consulting, 24/7 support, and customized solutions to help clients improve operational efficiency through cutting-edge technology.
*Demo License